Bỏ qua tới nội dung chính
Luyện đọc
Reading · Luyện đề

Part 7 · Reading Comprehension

00:00
Reading Comprehension
0/11 câu
Article
ARTICLEQuestions 99–102

Spectacular Bridge Created

By Marcia Brunon
March 14

Five years ago, the town of Stonewell, situated at the foot of the Marshall Mountains, decided to finance the building of a bridge across the Stonewell River. It was planned as a much-needed northern route for the town. - [1] - . The efficiency of the project was directly attributable to two RWC451 cranes, manufactured by Ronsonworks, a company based in England.

The two identical tower cranes were owned by the construction firm Redding Builders. One crane was assembled at the south bank of the river, while the other one was placed on a concrete pylon in the center of the Stonewell River. - [2] -. The assembly of the second crane was particularly challenging, as it required the use of another crane on a floating barge.

"Any large project is going to require unforeseen adjustments that may disrupt an official construction schedule," said Roger Lee, chief engineer of Redding Builders. - [3] - .In this case, the metal anchors that connected the bridge to the pylons were determined to be too small. The new anchors weighed 22 tons, which is within the safe lifting capacity of an RWC451 crane.

- [4] - . Engineers reinforced the existing cranes for extra security, and the cranes performed well.

Today, this postcard-worthy bridge is the pride of Stonewell, featuring viewing platforms for pedestrians, hikers, and visitors at the base of each pier overlooking the mountainous valley. Construction materials and colors harmonize beautifully with the local environment. All design elements, including the piers, viewing platforms, and railings, complement the natural landscape, making the bridge a hit with everyone from hikers to the truck drivers who now include it in their regular route.

99

What is mentioned about the cranes?

100

What is indicated by Mr. Lee?

101

What is NOT suggested about the Stonewell Bridge?

102

In which of the positions marked [1], [2], [3], and [4] does the following sentence best belong? "The project, which was expected to take four years, was completed in less than three."

Bài 1 / 3
Bài 1 / 3
Nộp bài

Nộp bài làm?

Còn 11 câu chưa làm. Câu bỏ trống được tính là sai.

Góp ý · Báo lỗi

Bạn đang gặp vấn đề gì?

Đề sai đáp án, audio lỗi, nút bấm không chạy hay một ý tưởng — mọi góp ý đều giúp TID tốt hơn. Trang bạn đang xem được gửi kèm tự động.

Vấn đề *
Ảnh chụp màn hình · tối đa 3