Bỏ qua tới nội dung chính
Luyện đọc
Reading · Luyện đề

Part 7 · Reading Comprehension

00:00
Reading Comprehension
0/10 câu
Report
REPORTQuestions 324–326
To:
All Staff
From:
Damian Perez
Date:
September 3
Re:
Safety inspection

MEMO

Tomorrow, September 4, we will have a safety inspection here in the factory. The inspector, Ms. Hannah Langan, is expected to arrive at 8:30 A.M. and depart by 3:30 P.M. Note that there will be preliminary meetings prior to the inspection itself. The schedule is below.

TimeActivityRequired AttendeesLocation
9:00 A.M.Opening meetingAll staffCafeteria
10:00 A.M.Inspector meets with General ManagerDamian PerezMeeting Room C
11:30 A.M.LunchDamian PerezCafeteria
12:30 P.M.Operations inspectionAll staffFactory floor

With the exception of the opening meeting, factory floor workers should be at their regular stations throughout the day. During the operations inspection, the inspector may visit workstations and ask about machines. Please respond directly and honestly, and then continue working as soon as the inspector moves on.

324

Who most likely is Mr. Perez?

325

When will the inspection begin?

326

What does the memo suggest about factory floor workers?

Bài 1 / 3
Bài 1 / 3
Nộp bài

Nộp bài làm?

Còn 10 câu chưa làm. Câu bỏ trống được tính là sai.

Góp ý · Báo lỗi

Bạn đang gặp vấn đề gì?

Đề sai đáp án, audio lỗi, nút bấm không chạy hay một ý tưởng — mọi góp ý đều giúp TID tốt hơn. Trang bạn đang xem được gửi kèm tự động.

Vấn đề *
Ảnh chụp màn hình · tối đa 3