E-MAILQuestions 64–68
To:
Yuriy Danylenko
From:
Larysa Bondar
Date:
May 4
Subject:
Vektra 5000 in Building F

Yuriy,

The Vektra 5000 in Building F is not working properly. It does not run at a steady speed and needs constant attention from the line workers. It passed its monthly inspection with an acceptable rating, yet it is now slowing production across the whole of Building F. I am worried that it may break down completely unless someone looks at it very soon.

Please send a technician as soon as you can, because we will probably have to adjust the production schedule while the machine is out of service.

Thank you,
Larysa Bondar
Production Manager
E-MAILQuestions 64–68
To:
Larysa Bondar
From:
Yuriy Danylenko
Date:
May 4
Subject:
RE: Vektra 5000 in Building F

Larysa,

Unfortunately, our in-house repair team is already stretched beyond capacity, so I am about to bring on some additional technicians. In the meantime, I have arranged for Sokil Technical Services to send one of their technicians to inspect the machine and carry out any repairs that are needed. We have worked with this firm before, and they are excellent. They will need access to Building F tomorrow between 1:00 and 2:00 P.M.

They have warned me that the machine may be out of use for up to two hours because of testing. As there is a large order due to Karpaty Motors next week, I have copied Marko Tkachenko, who may have to schedule some line workers for overtime to make up for the delay.

Yuriy Danylenko
Director of Maintenance
REPORTQuestions 64–68

Sokil Technical Services - On-Site Service Report

This on-site service report was prepared for Veres Industries following the fault reported in Building F. The Vektra 5000 was examined on May 5, and the checks listed below were carried out before the machine was returned to service.

Test No.Check performedResult
145Control panel responsePassed
372Lubrication and sealsPassed
419Emergency stop functionPassed
526Speed regulation under loadFault found - drive belt replaced

Technician: Ihor Symonenko. The machine was out of use for about two hours while the tests were carried out.

64

196. What is the purpose of the first e-mail?

65

197. What has Mr. Danylenko decided to do about the problem in Building F?

66

198. What is most likely true about the Vektra 5000's monthly inspection?

67

199. For which company does Ms. Bondar most likely work?

68

200. According to the report, which test led to the replacement of a machine part?

Bài 1 / 3
Bài 1 / 3
Nộp bài

Nộp bài làm?

Còn 11 câu chưa làm. Câu bỏ trống được tính là sai.

Góp ý · Báo lỗi

Bạn đang gặp vấn đề gì?

Đề sai đáp án, audio lỗi, nút bấm không chạy hay một ý tưởng — mọi góp ý đều giúp TID tốt hơn. Trang bạn đang xem được gửi kèm tự động.

Vấn đề *
Ảnh chụp màn hình · tối đa 3